Complete line for assembly of ball valves, with final welding and leakage and functional testing "EASY SETUP"

MS 950

TECHNICAL SPECIFICATIONS

Cycle Time 40 sec/piece
Automatically managed components 11
6 product sizes managed with Automatic & Quick setup
"EASY SETUP" for fast production changeover
2 rotary tables with asynchronous pallet line, 4 interface robots and flexible feed
Assembly area with double rotary table
Welding area with 2 automatic sub-connected stations and cooling station
Automatic testing area 100% functional / HELIUM leaktest and laser marking
Full traceability and retraceability
I4.0 ready